The Great Hall Project is a large renovation of the existing Denver International Airport, Jeppeson Terminal. We were hired by Engineered Demolition, Inc. to analyze the existing structure to support the proposed means and methods of their demolition scope. This analysis required us to determine the design loads of the demolition process and compare them with the design loads of the existing structure. In some cases, we had to analyze the existing structural members when load comparisons did not work. The analysis of demolition operations for phase 1 include...